Castiadas School

Olia Speciosa, Sardinia
2022 — 2026
Under construction

Castiadas School

One school, many landscapes.

The Castiadas school project moves across different scales and times: its setting in the landscape, the articulation of buildings A, B and C, shared spaces and the design of the roofs. Sketches, competition images, revised renderings, plans and sections document a process that continues on site.

Futura · 2022The competition and the idea of a school

Inside the project

Open each image to take a closer look.

103 images

PDV.TA02 · Ground-floor plan — 2025 revision · 1:50Drawings / 2025
PDV.TA03 · First floor and roofs — 2025 revision · 1:50 / 1:200Drawings / 2025
PDV.TA01 · General site plan and orthophoto — 2025 revision · 1:200 / 1:500Drawings / 2025
PDV.TA08 · Transverse sections of buildings A and B — 2025 revision · 1:20Drawings / 2025
PDV.TA10 · Construction sections of building C — 2025 revision · 1:20Drawings / 2025
PDV.TA09 · Longitudinal sections of buildings A and B — 2025 revision · 1:20Drawings / 2025
Overall construction view between the three buildings · 2026-08-26Construction / 2026
Resin physical model — portrait with the modelPhysical models
Drone view — the three buildings during assembly · 2025-07-16Drone / 2025
Timber interiors during construction · 2025-10-03Construction / 2025
Roof build-up under construction · 2026-08-26Construction / 2026
Interior spaces and openings to the outside · 2026-08-26Construction / 2026
Progress of the interior spaces · 2026-08-26Construction / 2026
The elevation and envelope under construction · 2026-07-28Construction / 2026
Building C — elevation under construction · Site visit 11.09.2026Construction / 2026
Building B — longitudinal elevation · Site visit 11.09.2026Construction / 2026
Building A — progress of the main elevation · Site visit 11.09.2026Construction / 2026
Timber buildings and existing trees · 2025-10-03Construction / 2025
Erection of the timber panels · 2025-09-04Construction / 2025
Exposed timber structure and floor · 2025-09-05Construction / 2025
Openings and connections between the buildings · 2025-09-10Construction / 2025
The courtyard during timber construction · 2025-09-12Construction / 2025
Drone view — the school and its landscape · 2025-07-16Drone / 2025
Resin physical model — the three buildings and open spacesPhysical models

24 / 103

Project and image credits

Project and image credits are being updated.